Cutting Costs by Cutting Assumptions: How One Operator Saved $1.2M
When routine inspections flagged dozens of anomalies on a legacy pipeline, a major Canadian operator was forced into reactive mode—triggering 50 urgent digs and putting pressure on budgets, teams, and timelines. But what if those digs weren’t actually necessary? In...
Calibration of a Nondestructive BTM Tester for Accurate In-Field Fracture Toughness
Don’t Let the Seam Weld Break You: How Seam Weld Toughness Impacts Pipeline Integrity
